ANALYSIS OF RESULTS OF LOAD-CARRYING ABILITY OF GIRDER BRIDGE CONCERNING TO OTHER SYSTEM BRIDGES FOR PASSING HEAVY-WEIGHT CARGOES
PDF

Як цитувати

Slovinski, Y., Lekiashvili, V., Topuria, N., Tedoradze, R., & Balakhadze, D. (2021). ANALYSIS OF RESULTS OF LOAD-CARRYING ABILITY OF GIRDER BRIDGE CONCERNING TO OTHER SYSTEM BRIDGES FOR PASSING HEAVY-WEIGHT CARGOES. InterConf, (39). вилучено із https://ojs.ukrlogos.in.ua/index.php/interconf/article/view/8076
PDF

Посилання

Slovinski Yu. Planning of works organization on bridges construction with span structures, manufactured by GPI technology and their type-design adjustment. Tbilisi: Georgian Polytechnic Institute, 1962. -90p. (In Russian).

Polivaniv N. Design and analysis of reinforcement concrete and metal motor road bridges. Moscow: Transport, 1970. -625p. (In Russian).

Technical requirements on design of railway, motor road and city bridges and pipes (sinTezi-200-62). Moscow: Transport, 1970. -328p. (In Russian).

Kochiev U. Calculation of elements of reinforcement bridges spans. Tbilisi: Ganatleba, 1977.– 166p. (In Georgian).

Gaiduk K. et al. Maintenance and repair of bridges and pipes on motor roads. Moscow: Transport, 1976. -276p. (In Russian).

Creative Commons License

Ця робота ліцензується відповідно до Creative Commons Attribution 4.0 International License.

Завантаження

Дані завантаження ще не доступні.

| Переглядів: 1 | Завантажень: 3 |